Design and build of the first-phase marina at Al Zorah in Ajman: floating pontoons along the quay wall, with gangways and pile guides, handed over in August 2015.

We designed, fabricated and installed the floating marine works for the first phase of the Al Zorah waterfront: promenade pontoons running along the quay wall of the marina basin, landing pontoons and aluminium access gangways.

The pontoons are 4 and 5 m wide and held on steel piles with internal pile guides. Access is by three sizes of truss gangway, 10 × 2.5 m, 12.5 × 2.5 m and 16 × 3 m, each designed in-house with its own structural report.

The works were certified complete and taken over by the owner on 31 August 2015.

Scope

Layout designStructural designAluminium fabricationInstallation
Want something like this?

We can build to this design or adapt it to your requirements.

Ask about this project

General arrangement

Drawings © Al Manzel Marine. For illustration only, not for construction. Not to be copied or reproduced without our written permission.